Roof design and materials
Connect the intended appearance with the specific system and the roof’s design requirements.
Bring the roofing conversation into the plans early. Brehm provides new construction roofing, helping homeowners and project teams connect the roof design, material choices, and installation sequence.
Gainesville office · 352-664-8585

Brehm project photography
Connect the intended appearance with the specific system and the roof’s design requirements.
Discuss who handles penetrations, adjacent materials, access, and changes that affect the roofing work.
Retain product selections, applicable warranty information, and project records with the building documents.
New construction roofing works best when product, roof geometry, penetrations, and trade interfaces are settled while plans can still change. Brehm provides new-construction roofing with dual Florida licenses CCC1336098 and CRC1334991, insurance and workers’ comp for permits, and Owens Corning Platinum Preferred options on qualifying systems.
Share current plans, material selections, access, and a single builder point of contact. Dry-in details matter: underlayment, drip edge, valleys, wall/dormer flashing, then field shingles, pipe boots, and hip/ridge when the deck is ready. Keep product choices and warranty documents with the building closeout package.
About 94% of Brehm projects finish within 36 hours of crew arrival, with a bilingual crew leader, site supervisor, and CompanyCam documentation on the job. Call 352-664-8585 to coordinate roofing on your build.
Explore the project photography, then ask how the details apply to your own home.
From Brehm’s project collection. Photos are not assigned to a specific service-area city.
Live reviews from homeowners across North Central Florida, straight from Google.
Useful answers to start with. Your property and proposed scope make the conversation specific.
Talk with BrehmBring the roofing discussion into the project while design and material decisions can still be coordinated. Share current plans and ask which choices affect the roof assembly, interfaces, and the construction sequence.
Discuss a proposed change with the project team before ordering or installing materials. A different system can affect detailing, supporting requirements, selections, and schedule. Confirm the revised scope and approvals where applicable.
Current plans, roof details, material selections, site access, trade coordination, and a clear point of contact make the conversation more productive. Share revisions that affect the roof rather than relying on an earlier drawing.
A new construction project starts with the planned building assembly and coordination among trades. Replacement also involves evaluating and removing or addressing existing roofing conditions. Both need a scope suited to the actual project.
Choose a starting point and see which questions belong in the conversation.
Share the roof design, architectural goals, and relevant plan information. Material choice, roof geometry, ventilation, and transitions should be considered together.
Bring this questionWhich roofing decisions need to be resolved before the next construction phase?
Roof work connects with framing, wall transitions, penetrations, and other project details. Identify who coordinates those interfaces and communicates schedule changes.
Bring this questionWho owns each handoff between the roofer, builder, and other trades?
Confirm the agreed products, access, staging space, and expected sequence with the project team. Keep changes to plans or selections visible to the people doing the work.
Bring this questionHave the final selections and plan changes reached the roofing team?
Explore the handoffs that belong in an installation plan. The sequence is a guide, not a promised duration.
Connect the roof design, product selections, property requirements, and project responsibilities before the work begins.
Discuss access, material staging, property protection, and the conditions that need to be ready for installation.
The roof covering works with supporting materials and transition details. Keep changes and trade interfaces visible to the project team.
Discuss the completed scope, relevant inspections, and the product and warranty documents that should remain with the property.
Use this new construction roofing checklist to prepare. Add the questions you want answered and download your notes before talking with Brehm.
Get a free roof inspectionShare the property address, what you have observed, and any known roof history. The findings help shape the next step.
Download a blank checklist with six questions for this service. Interactive notes require JavaScript; nothing entered on this page is saved without it.
These notes are not sent to Brehm. Download a copy to bring to your conversation.
Bring your questions. We’ll start with your property and the next step.